Current Commission cases
A development application for a hard rock quarry that would extract, process and transport up to 700,000 tonnes of hard rock material per annum to supply construction material to the approved Liverpool Range Wind Farm project (SSD-6696).
A seniors housing development providing for 120 bed residential care facility , 199 independent living units, ancillary amenities and landscaping.
Recent Commission cases
A development application for the demolition of existing buildings and the construction of a 46-storey shop-top housing development comprising of 390 build-to-rent units, four levels of basement parking and a podium with a pedestrian through-site link and retail tenancies.
Modification to limits on approval condition to allow for decommissioning, rehabilitation and other requirements in relation to mining operations to continue beyond the consent lapse date.
A development application for a 500 MW solar farm and 500 MW / 1,000 MW-hour battery energy storage system.
Development of a 250 MW / 1100 MWh battery energy storage system and associated infrastructure and connection works.
A modification application for an approved open-air cargo storage facility to permit the storage of lithium-ion batteries.
The Minister for Heritage has requested the Commission to undertake a review of a recommendation from the Heritage Council of NSW to list Woolley Townhouse, Paddington on the State Heritage Register pursuant to section 32(2) of the Heritage Act 1977.
A request to provide advice to the Minister for Planning and Public Spaces on the potential State or regional planning significance of proposed site rehabilitation works at Bombo Quarry.
A development application for the conversion and restart of the dormant Redbank Power Station to generate energy with the use of up to 700,000 dry tonnes per year of biomass as a fuel source.
An Amending Concept development application for alterations and additions to the Concept building envelopes approved via SSD-8784 to accommodate additional apartments, including increased building heights, additional gross floor area, an additional basement car parking level and minor alterations to building footprints. An Amending Detailed Design development application for alterations and additions to the development approved via SSD-31576972 for the construction of the development in accordance with the Concept amendments proposed.
Development of a 247 turbine wind farm with a generating capacity of 1,300 MW and a 500 MW battery energy storage system.
A waste and resource management development application for a plastic recycling facility with capacity to process up to 120,000 tonnes of plastic waste per annum and manufacture plastic fibres and resins.
A development application for the demolition of existing buildings and the construction of a shop-top housing development comprising of 198 build-to-rent units, retail premises, car parking across 3 basement levels, residential amenities, co-working spaces and communal spaces.
A renewable energy development application for a 943MW wind farm comprising 131 wind turbines and a 320MW / 640 MW-hour battery energy storage facility.
A quarry development application to extract and process up to 1.5 million tonnes of hard rock per annum.