Helen Mulcahy
Heather Warton
Referral Received: 16/01/2020 Completed / Determined: 16/03/2020
Elf Mushroom Farm MOD3 Concept Approval
16.03.2020 | pdf | 1.0 MB
Elf Mushroom Farm MOD3 Project Approval
16.03.2020 | pdf | 1.4 MB
Elf Mushroom Farm MOD3 Statement of Reasons
16.03.2020 | pdf | 361.6 KB
17.01.2020 | pdf | 462.5 KB
08_0255 MOD 3 Assessment Report Recommendation
17.01.2020 | pdf | 11.8 MB
08_0255 MOD 3 Concept Plan Consolidated
17.01.2020 | pdf | 1017.8 KB
08_0255 MOD 3 Concept Plan Modification Instrument Recommendation
17.01.2020 | pdf | 1011.5 KB
08_0255 MOD 3 Project Approval Consolidated
17.01.2020 | pdf | 9.4 MB
08_0255 MOD 3 Project Approval Modification Instrument Recommendation
17.01.2020 | pdf | 1.4 MB
24.02.2020 | pdf | 93.3 KB
200226_OUT_Department re Conditions
27.02.2020 | pdf | 98.8 KB
200309 IN Department Response re Conditions
13.03.2020 | pdf | 66.9 KB
Attachment_ DRAFT Conditions for Department comment 26 Feb 2020
27.02.2020 | pdf | 1.5 MB